- Repairing of the main drain on a slope, cross drain on slope, service road, etc. of old ash dyke in the year 2021arrack 1 in the year 21-22
- Soil topping for proposed solor plant at renusagar in the year 2021.
- Repairing of main drain slope, cross drain slops at bichari.
- Construction of new weigh bridge in the year 2021.
- Repairing of bitumen road in plant area in 2022.
- Repairing of bitumen road in colony area in 2022.
- Civil construction work for installation of filter press at ETP in 2022.
- Repairing of approach road for smooth transportation at main ash dam & pre dam in 2022.
- Construction of badminton court for DET’s in colony area in 2022.
- Laying of Bitumen Road at old ash dyke area (madhuban Park) area in 2022.
- Laying of WBM & Bitumen Road at Bichhori Road from PWB road to Kauwa nallah.
- Rerouting of ash water pipe line, CW water line Electrical cable etc. for field work.
- Construction of Mcc room for Field implementing in unit #5
- Excavation work for field building & acid tank foundation.
Hindalco Industries Limited (Renusagar power division)
PROJECT DETAILS
Categories: | |
Client: | Hindalco Industries Limited |
Location: | N/A |
Completed: | 2022 |